Storage shed hanging from a Cooper Crane boom over the roof of a house

Shed Moving & Placement in South Florida

The shed is built, the pad is poured, and the only way into the backyard is a 34-inch gate. That is the call we get, and the answer is almost always to go over the house instead of through the side.

Get a Quote

Tell us the load and where it is. We call you back with a number.

Lifting:
Tap the closest one. We sort the details on the call.
A city is enough to price the drive from our Broward yard.
Give us a city so we can price the drive.
We need a name and a number to call you back.
Sent. Talk soon.

That went straight to the yard. We will call you back with a number.

Or call now: (954) 445-6186

Rather just talk? Call the yard at (954) 445-6186

Most South Florida backyards are fenced on all sides with a side yard too narrow to walk a finished shed through. Dealers deliver to the driveway and stop there, which leaves the homeowner staring at a building that cannot reach the spot it was bought for.

A crane turns that into a twenty-minute problem. We pick the shed off the delivery trailer or the driveway, take it over the roofline, and set it square on the pad. No panels come off, no fence sections come out, and nothing gets dragged across the grass.

Quick spec
Typical machine
17-ton boom truck
Common weight range
300 lb to 2+ tons
Usual time on site
1 to 2 hours
Also handles
Relocating an existing shed

What we need to know first

  • Size and weightFootprint and dry weight off the dealer spec. Resin and metal sheds are light; a finished wood or concrete-board building can run well past a ton.
  • What we have to clearThe roofline is the usual obstacle, but pool cages, screen enclosures, awnings and power lines all change the pick.
  • Where the truck can sitDriveway or street frontage. The further the pad is from where we can park, the more reach we need.
  • Is the pad readyPoured, level and cured. If it is not, we can stage the shed and come back, but that is a second trip.

Rigging a finished building

A shed is not a solid block, and that is the part people underestimate. It has to be picked from points that carry the frame rather than the skin, or it racks in the air and the door never closes right again. If the dealer has provided lift points or a rigging spec, send it. If not, we will look at the construction and rig it off the frame.

Moving an existing shed within a property works the same way, though an older building that has been sitting on grade for years needs a look first. Sometimes the honest answer is that it will not survive the lift, and we would rather say that on the phone than halfway up.

Cooper Crane boom truck lifting a shed off a delivery trailer on a residential street
Off the dealer trailer and straight to the pad.

Shed Moving Questions

Yes. Every Cooper Crane machine comes with a certified, experienced operator who handles the rigging and signaling. There is no separate operator to hire.
Every job from West Palm Beach to South Miami: Palm Beach, Broward and Miami-Dade counties, out of one Broward yard on one number, (954) 445-6186.
Tell us how heavy the load is, how high it has to go and how far the crane has to reach, plus any access limits. We spec the right machine on the call, and we pick the smallest one that safely does the job.
Earlier is better for scheduling, but we keep multiple machines in the yard and will always try to work in urgent and same-week lifts.